Cyfernod / Ref NoCP64/35
Teitl / TitleViews of the tailings pond
Ddisgrifiad / Descriptionshowing the pipe system with its many discharge points. The pipes had reinforced rubber corners as metal corners suffered from the highly abrasive material passing through them; about 300 tons of solids each day.
Dyddiad / Daten.d.
Graddau / Extent1 item
Lefel / LevelItem
Ddelweddau / Image

4a\97d059-8304-42d9-93fa-26b53fc10477.jpg