Cyfernod / Ref NoCP64/34
Teitl / TitleViews of the tailings pond
Ddisgrifiad / Descriptionshowing the pipe system with its many discharge points. The pipes had reinforced rubber corners as metal corners suffered from the highly abrasive material passing through them; about 300 tons of solids each day.
Dyddiad / Daten.d.
Graddau / Extent1 item
Lefel / LevelItem
Ddelweddau / Image

7a\d77e6f-5683-4408-9dcc-87e7faf57dc3.jpg

    Powered by CalmView© 2008-2025