Cyfernod / Ref NoCP64/33
Teitl / TitleViews of the tailings pond
Ddisgrifiad / Descriptionshowing the pipe system with its many discharge points. The pipes had reinforced rubber corners as metal corners suffered from the highly abrasive material passing through them: about 300 tons of solids each day.
Dyddiad / Daten.d.
Graddau / Extent1 item
Lefel / LevelItem
Ddelweddau / Image

28\6cf975-8521-435c-871d-336eda19008f.jpg

    Powered by CalmView© 2008-2025