Cyfernod / Ref NoCP48/1/12
Teitl / TitleExcavation of oyster tanks nearly completed, concrete has been laid on the floor of the lower tank. [8/21]
Ddisgrifiad / Description[Includes three copies of the print.]
Dyddiad / Date1921 Aug 17
Graddau / Extent1 slide
Lefel / LevelItem
    Powered by CalmView© 2008-2025