Ddisgrifiad / Description | The bridge was completed by 1826. Total span is 326 feet. The towers were built to harmonise with Conwy Castle. This bridge was superseded by a 1957 bridge engineered by Sir William Arroll. The footbridge was erected in 1904. RCAHM Caernarfonshire Vol. 1 East (1956) Page 69 (198). |